A coolie A takes 1 minute to lift a load to the roof of a bus, whereas coolie B takes 2 minutes to lift the same load to the roof of the same bus. The work done by B is:
Work, Energy and Power · Question 5 of 146
A coolie A takes 1 minute to lift a load to the roof of a bus, whereas coolie B takes 2 minutes to lift the same load…
- Correct answer
(A) equal to work done by A
(B) greater than work done by A
(C) less than work done by A
(D) none of the above
Answer: (A) equal to work done by A
Concept: To lift a body of mass m through a vertical height h, a force equal to its weight mg must act through h, so the work done against gravity is W = mgh. Only the vertical height counts, not the path or the time.
Step 1 — Compare the loads and heights.
Both coolies lift the SAME load (same weight mg) to the roof of the SAME bus (same height h).
Step 2 — Work out each one's work.
Work against gravity is weight × vertical height, which is the same for both.
Step 3 — See what the time changes.
The time taken changes only the POWER (P = W ÷ t). A takes 1 min and B takes 2 min, so A develops twice the power of B, but the work is the same.

Watch out: Do not confuse work with power: being slower means less power, not less work.
Why the other options are wrong:
- (B) greater than work done by A: B takes longer, but taking longer does not mean doing more work; the work depends only on the load and the height.
- (C) less than work done by A: B is slower, which means B develops less POWER; his work is still mgh, the same as A's.
- (D) none of the above: option (A) is correct, so 'none of the above' cannot be.
Therefore, the work done by B is equal to the work done by A, option (A).
