Confirming your payment

Skip to content

Sign up now and get .

Competency-Based Questions (CBQ) · Question 37 of 40

Competency: Creativity Case study: A school has a new music room beside a busy lane.

Question 374 marksHard

Competency: Creativity

Case study: A school has a new music room beside a busy lane. Its walls are bare and its floor is tiled. The principal asks the science club to find out how the noise of the lane inside the room can be reduced. The club plays a recording of lane noise outside the room, tries different treatments one at a time, and measures the sound level in the middle of the room with a sound-level meter. (Hypothetical data.)

Treatment of the music roomSound level of the lane noise inside (dB)
None (bare walls, tiled floor)74
Thick curtains on the windows only68
Carpet on the floor only70
Curtains, carpet and cushioned wall panels together58

(a) Which single treatment lowers the level most? By how many dB, and by what factor does the sound intensity fall? (Take log⁡104=0.60\log_{10} 4 = 0.60.)

(b) Explain how soft materials such as curtains, carpets and cushions lower the sound level in a room.

(c) Suggest a plan for the school to make the music room quiet. Support it with the table, and add one more measure that is not in the table.