A can do a piece of work in '' days and B can do the same work in days. If both working together can do it in 15 days; calculate ''.
Solving (simple) Problems · Question 35 of 88
A can do a piece of work in ' x ' days and B can do the same work in (x + 16) days.
Solution:
Concept: If someone can finish a work in days, he does of the work in one day. When people work together, their one-day works add up, and the time taken together is 1 divided by the total one-day work. Here the time of one worker is unknown, so the equation in becomes a quadratic equation.
Given: A takes days and B takes days to do the work alone; together they take 15 days.
Step 1 — Write the one-day works.
In one day A does of the work and B does . Together they do of it in one day.
Step 2 — Form the equation.
The two one-day works add up to the joint one-day work.
Step 3 — Clear the fractions.
We multiply every term by , the L.C.M. of the denominators, and bring every term to one side.
Step 4 — Solve the equation.
We split the middle term. We need two numbers whose product is −240 and whose sum is −14. They are −24 and 10, so we write −14x as −24x + 10x.
A product is zero only when one of its factors is zero, so we set each bracket equal to zero.
A number of days cannot be negative, so we reject and keep . Then B takes , which is 40 days.
Check: A and B together do 1/15 of the work in a day.
Watch out: Add the one-day works (), never the days.
Therefore, (A takes 24 days and B takes 40 days).
