Confirming your payment

Skip to content

Sign up now and get .

Competency-Based Questions (CBQ) · Question 37 of 40

Competency: Application & Analysis Case study: A road-side drain is made of concrete.

Question 375 marksHard

Competency: Application & Analysis

Case study: A road-side drain is made of concrete. It is 12 m long and has the same cross-section all along. The figure shows the cross-section, a U-shape with an open channel on top. The channel carries the water.

Class 9 Maths Solids Question 37

(a) Find the area of the cross-section of the concrete.

(b) Find the volume of concrete used, in m³, and its cost at ₹ 7,500 per m³.

(c) The two inside walls and the floor of the channel are to be plastered at ₹ 45 per m². Find the cost of plastering.