Question 92 marksMedium
Competency: Application
On a building site, a helper lifts a bucket of bricks using a single pulley fixed at the top of a pole. The bucket of bricks weighs 225 N. To raise it through 4 m, he pulls the rope down through 4 m with a steady force of 250 N.

(a) Find the efficiency of the pulley. (Work done = force × distance)
(b) How much work is wasted, and where does it go?
