Two coolies A and B do some work in time 1 minute and 2 minute respectively. The power spent is :
Energy · Question 3 of 80
Two coolies A and B do some work in time 1 minute and 2 minute respectively. The power spent is :
(A) same by both coolies
- Correct answer
(B) is more by coolie A than by B
(C) is less by coolie A than by B
(D) nothing can be said.
Answer: (B) is more by coolie A than by B
Concept: Power is the rate of doing work: the work done (or energy spent) divided by the time taken, . Its S.I. unit is the watt (W), where 1 W is 1 J s.
Step 1 — Read what is compared.
The stem compares the powers of two coolies doing a job, so it takes both of them as doing the same work (for example, lifting equal loads to the same height). Coolie A takes 1 minute and coolie B takes 2 minutes.
Step 2 — Write each power.
Power is work divided by time, so for the same work :
Step 3 — Compare the two.
Dividing the first power by the second shows that A's power is twice B's power:
Step 4 — State the result.
The coolie who does the same work in less time spends more power, so the power spent is more by coolie A.
Watch out: Less time means more power only when the work is the same; power depends on both the work and the time.
Note: The book prints "do some work". It means the same work, and the key (B) is worked that way. If the two amounts of work were different and unknown, the powers could not be compared.
Why the other options are wrong:
- (A) same by both coolies: The powers would be the same only if the two coolies took equal times for the same work.
- (C) is less by coolie A than by B: This is the reverse of the truth: A takes less time, so A's power is more, not less.
- (D) nothing can be said: Once the work is taken to be the same and both times are known, the powers can be compared.
Therefore, the power spent is more by coolie A than by coolie B, option (B).
