Confirming your payment

Skip to content

Sign up now and get .

Competency-Based Questions (CBQ) · Question 14 of 40

Competency: Evaluation Case study: A school has a three-storey building with a water tank on its roof.

Question 144 marksMedium

Competency: Evaluation

Case study: A school has a three-storey building with a water tank on its roof. The top of the tank is the highest point of the building. Three contractors offer to fix a lightning conductor. Each will use a thick copper strip with sharp spikes at its upper end.

PlanUpper end (spikes)Lower end
11 m below the top of the water tankjoined to a copper plate buried deep in the ground
21 m above the top of the water tankclamped to the wall 1 m above the ground
31 m above the top of the water tankjoined to a copper plate buried deep in the ground

(a) Which plan should the school accept ? Explain how this lightning conductor protects the building when a charged cloud passes overhead.

(b) State the fault in each of the other two plans and what it could lead to.

(c) Some years later the copper strip is found broken half-way down the wall. Is the building still protected ? Give a reason.