Confirming your payment

Skip to content

Sign up now and get .

Competency-Based Questions (CBQ) · Question 38 of 40

Competency: Analysis Case study — The hill ropeway A hill station has a ropeway 1.8 km long.

Question 384 marksHard

Competency: Analysis

Case study — The hill ropeway

A hill station has a ropeway 1.8 km long. Cable cars on one cable go up the hill, and cars on the other cable come down. All the cars move at the same steady speed of 6 m/s. On each cable the cars are 300 m apart. (Hypothetical data.)

(a) How long does a ride up the whole ropeway take, in minutes? What is the speed of the cars in km/h?

(b) A tourist in an upward car sees the downward cars pass by. How many seconds pass between one downward car passing and the next?

(c) The operator wants a downward car to pass the tourist's car every 20 seconds. How far apart should the cars on a cable be placed?