Confirming your payment

Skip to content

Competency-Based Questions (CBQ) · Question 40 of 40

A new metro line in Pune runs along a straight track.

Question 404 marksHard

A new metro line in Pune runs along a straight track. The position of each station is measured in km from Central station, which is at 0. East is positive and west is negative, and the positions are listed in the table. The gap between B and C is long, so the planners want to add one more station exactly halfway between them. Riya lives near station A. On Saturday she rides the metro from A to visit her friend at D, and then travels back towards Central and gets off at C for her dance class.

An elevated metro train on a viaduct above a city road

StationABCentralCD
Position (km)−334-3\frac{3}{4}−112-1\frac{1}{2}002252\frac{2}{5}5145\frac{1}{4}

Line diagram of the metro with stations A, B, Central, C and D from west to east

(i) Find the distance between station A and station D.

(ii) A new station is planned exactly halfway between B and C. Find its position, and say which existing station is nearest to it.

(iii) Find the total distance Riya travels on Saturday, from A to D and then back to C.