A school in Shillong builds 5 concrete steps at its entrance as 5 cuboid slabs stacked on one another, with their back…

Question 394 marksHard

A school in Shillong builds 5 concrete steps at its entrance as 5 cuboid slabs stacked on one another, with their back faces in line. Every slab is 1.2 m wide and 15 cm thick. The bottom slab is 1.5 m deep (front to back), and each slab above is 30 cm less deep than the one below it, so the top slab is 30 cm deep. The exposed top (tread) and the front face (riser) of every step will be covered with tiles costing ₹900 per m², including fitting.

Side view of five stacked slabs, each 15 cm thick, bottom slab 1.5 m deep, top slab 30 cm deep, width 1.2 m

(i) Find the volume of concrete in the bottom slab.

(ii) Find the total volume of concrete in the steps.

(iii) Find the area to be tiled and the cost of tiling.