Option (B) is correct.
Before: constraints x+y≤60, 2x+y≤100. The lines meet at (40,20). Corner points and values of Z:
(0,0): 0; (50,0): 1500; (40,20): 1200+400=1600; (0,60): 1200. Maximum ₹1600.
After: constraints x+y≤70, 2x+y≤100. The lines meet at (30,40). Corner points and values of Z:
(0,0): 0; (50,0): 1500; (30,40): 900+800=1700; (0,70): 1400. Maximum ₹1700.
Increase =1700−1600= ₹100. The budget was already fully used at (40,20), so the extra space is used by giving up 10 units of P (−₹300) to stock 20 more of Q (+₹400).
(A) is wrong: ₹300 assumes 10 extra units of P, but that needs 2(50)+20=120>100, beyond the budget.
(C) is wrong: ₹200 assumes 10 extra units of Q with no P given up, but (40,30) needs 2(40)+30=110>100, beyond the budget.
(D) is wrong: the shelf constraint was binding at the old optimum (40+20=60), so relaxing it moves the optimum to (30,40).